Skip to main content
Settings

How to Manage Pipeline Stages

Add, rename, reorder, or delete the columns on your order board.

Written By Dennis Rodin

Last updated 10 days ago

To manage your pipeline stages, go to Settings → Stages, under Workflow & Pipeline. The Your pipeline card shows your stages in the same order as on the board. Click Edit stages to open the stages popup, where you can change all your existing stages. Edit stages needs the Edit settings permission.


Order boards: separate stages for service or bronze orders

If one kind of order follows different steps than the rest, give it its own board. At the top of Settings → Stages the Order boards section has an Add board button. Every shop has a Main board, which holds the stages described in the rest of this article. An extra board, for example Service or Bronze, has its own Quote, Confirmed Order and Completed, like Main, with stages of your own in between.

In the Add order board window, enter a Board name and choose the orders that land there under Orders that land here: Service orders (every service order), one single service type under Services, or Bronze under Monuments. A choice can be used by one board only. The new board starts with Quote, Confirmed Order and Completed; after you save, add your own stages in between. An order that matches a board's rule lands on that board from the first quote and stays there when you confirm it, so a Bronze quote confirms into Bronze's Confirmed Order. Orders that no board's rule matches go to Main.

With more than one board, Settings → Stages shows each board with the rule it takes and its number of open orders, plus one stage card per board. Each card has its own Edit stages button that opens that board's stages. Use the arrows to change the order of the boards, the pencil to edit a board and the bin to delete it. A board can be deleted when it has no open orders; its stages are deleted with it and archived orders on it move to Main: quotes to Quote, confirmed orders to Confirmed Order.

In Order Management, a board switcher with the number of orders per board appears as soon as you have a second board. While you only have Main, nothing changes on the page. To move an order to another board, open the order, open its stage dropdown and pick the board under Move to board. The list shows where the order will land under each board (Lands in): a quote lands in that board's Quote and a confirmed order in its Confirmed Order. Quotes stay quotes and confirmed orders stay confirmed.


Rearranging stages

Drag a stage by its grip handle, the dotted handle at the top right of the stage card, and move it left or right. When you let go, the stage drops into the nearest spot it is allowed to take. The order in the popup matches the order on your board.

You can also move a stage with the keyboard: tab to its grip handle, press Space to pick it up, move it with the left and right arrow keys, and press Space again to drop it.

Note: Quote always stays first and Completed always stays last, and neither can be moved. Confirmed Order can be moved, but never ahead of Quote, so you can put stages of your own between the two. Quote, Confirmed Order, Ready to Install and Completed cannot be renamed. Ready to Install keeps its built-in behavior and can be dragged to wherever it fits in your workflow.


Renaming a stage

Click the name of any stage to rename it. Type the new name directly in the field and click off the field to save it.


Changing stage colors

Below each stage name you can change the color for display purposes. Pick whatever color helps you visually organize your board. Typing stage colors in the Search settings... box finds Edit Workflow Stages, which opens this popup.


Adding a new stage

First, click the Add Stage button on the right side:

After that enter the stage name and pick a color. The new stage is added just before Completed; drag it by its grip handle to the position you want on the board.


Your own stages between Quote and Confirmed Order

You can add stages between Quote and Confirmed Order to follow a quote along, for example Contacted or Quote sent. Add the stage, then drag it between the two.

Every stage to the left of Confirmed Order counts as a quote: an order there has no invoice, gets no confirmed-order to-dos, and brings up no payment prompt while you move it between those stages. Confirmed Order and every stage after it count as an order. Moving an order from a quote stage onto Confirmed Order or any later stage confirms it, the same as moving it out of Quote: the invoice, the confirmed-order to-dos and the QuickBooks sync follow.

Editing a quote that sits in one of your own quote stages keeps it in that stage.


Deleting a stage

Click delete on any stage and a popup will ask you to confirm. Click Delete Stage to remove it.

If the stage has orders in it, you'll see a dropdown asking which stage you want to move those orders to. Select the stage, then click Delete. The orders will be moved to the stage you selected.

Warning: Choose carefully when moving orders during a delete. Once you confirm, this cannot be undone.

Four stages cannot be deleted: Quote, Confirmed Order, Ready to Install, and Completed. These are used by the system and are required for MonuDesk to work properly. Quote and Completed are also locked in place, while Confirmed Order and Ready to Install can be repositioned. On an extra board, Quote, Confirmed Order and Completed cannot be deleted either.

What families see for each stage on their portal timeline is set under Settings > Customer Portal with Edit stages, not here: whether a stage is Customer-facing or Internal only, the portal subtext under the stage name, and Action required with its description, for example "Pay deposit before we proceed".

Learn more: How the Customer Portal Works


Saving your changes

When you're done, click Save & Exit at the top right of the popup. If you want to discard your changes, click Cancel.

Note: None of your changes take effect until you click Save & Exit.


Editing to-do steps

To-dos are not part of the stages popup. Each to-do has its own list of steps, and you set them up on a Settings page of their own: Settings → To-Dos, under Workflow & Pipeline. There you rename steps, add or delete them and drag them into a new order. See How to Configure To-Dos.

Tip: The stages you set up here also drive the Installations page. When you click a stage bubble on Installations to advance an order (for example, from "Must Schedule Install" to "Installation Scheduled"), you're moving it through the exact stages configured here. How to Use the Installations Page

Renaming a stage is safe here. The Installations page remembers your selected stages by the stage itself rather than by its name, so a stage you rename stays selected. Be aware that the stage selection on Installations is shared by your whole company: if you tick or untick a stage there, everyone in the shop sees the change.

Related articles: